
CORRIDOR Vc Motorway
Section: Zvirovići-Bijača
Subsection: Zvirovići-Kravice and Kravice-Bijača
FIDIC RED BOOK 1999
Project description:
Subsection Kravice-Bijača is long 4.06km. The project included construction of the motorway route, one overpass, three underpasses, interchange “Zvirići” and traffic control center. Subsection Zvirovići – Kravice is a long 5.0km long. The most important facilities are: Interchange “Zvirovići”, one underpass and one overpass, bridge “Studenčica„ (590m), bridge “Trebižat” (380m), tunnel “Bijela Vlaka” (485m).